Construction sites in our neighboring district
The construction sites for our last project in 2024 and the first in 2025 were both in the Türkheim market in Unterallgäu, practically on our doorstep again.
On the one hand, we were commissioned to dismantle and professionally dispose of an old wooden noise barrier that had been treated with chemicals, was very old and technically no longer protected against noise. The client had opted for our ecological RAU climate wall (R3) which offers a sustainable alternative to traditional noise barriers. A noise barrier made from the nature in which it stands. Ecological, economical, effective. Not only is it highly effective in reducing noise, it is also aesthetically pleasing, durable and helps to improve the natural habitat. The job should be completed before Christmas.
The second project in Türkheim was planned for early 2025, as soon as the winter allowed the work to be carried out. Here, too, old wooden walls made of steel beams were to be removed and disposed of professionally. We then installed our space-saving, greenable RAU Rock elements into the spaces between the existing steel beams. Turning old into new! This is how sustainability works!
Details
BV 01:
“Am Katzenbuckel”, 86842 Türkheim
(Dismantling and professional disposal of the old wooden noise barrier)
RAU Klimawand (R3)
Length: 90.00 m
Height: 2.40 m
Start of construction: 19.11.2024
Completion before Christmas
BV 02:
“Wörishofer Straße”, 86842 Türkheim
(removal and professional disposal of old wooden elements)
RAU Rock elements (https://rau.bayern/rau-rock-laermschutzwand.html) (made to measure)
Length: 400.00 m
Height: 1.75 m
Construction period: 20.01. to 19.02.2025
(with weather-related interruptions)
Client
Türkheim market
Maximilian Philipp-Straße 32
86842 Türkheim