Sustainable noise protection

100 % ecologically minded

Quick assembly

Stable, flexible, economical

Low-maintenance systems

Without constant irrigation

Innovative solutions

Can also be combined with photovoltaics

When space is tight, details and logistics come to the fore. In the urban area of Germering, noise protection often becomes a balancing point between usability, acceptance and construction progress. You will find current contacts on an ongoing basis. Developers look first at areas and the construction process, local authorities at the awarding of contracts and acceptance; both are brought together in the process. Late clarifications lead to rescheduling, supplements and additional rounds that put pressure on deadlines and budgets. We provide a comprehensible decision-making logic so that requirements, variants and interfaces remain in line. If dual use seems sensible, we examine the combination of noise protection and photovoltaics as an option, depending on the project requirements. A clear list of criteria stabilizes the next steps without complicating them unnecessarily. For local authorities, it is important that requirements are described in a verifiable manner and that decisions can be explained to the administration and committees. For developers, it is important that land use, outdoor spaces and development are not blocked by late changes. Late clarifications result in rescheduling, addenda and additional rounds of coordination that put a strain on the budget and deadline. A brief preliminary review separates the must-haves from the options and speeds up the comparison of variants. Depending on the project, a range is often more helpful than fictitious accuracy when plans are still in flux.

Your advantages at a glance.
  • Up to 12 m height
  • Without deep foundation
  • Quick assembly
  • Economic implementation
  • Greenable
  • Flexible lines
  • Suitable for tight spaces
  • Durable and robust

System selection for noise barriers in Germering

When deadlines are tight, preparation is crucial. When comparing variants, space requirements, appearance, robustness, construction phase and inventory quickly lead to different priorities. We structure the choice of system in such a way that the direction taken by the project team remains justifiable and detailed planning does not come to nothing. Alpine noise barriers are a pragmatic option, especially during the construction phase. If the focus is on design and environmental impact, we consider variants with a natural stone look and robust surfaces. For ecologically oriented projects, we consider systems such as the Klimawand R3 if a green wall logic fits into the comparison of variants. A comparison of variants works when must-have points are clarified first and details follow afterwards. For local authorities, it is important that requirements are described in a verifiable manner and that decisions can be explained to the administration and committees. For developers, it is important that land use, outdoor spaces and development are not blocked by late changes. Late clarifications lead to rescheduling, supplements and additional rounds of coordination, which put a strain on the budget and deadline. A brief preliminary review separates the must-haves from the options and speeds up the comparison of variants. Depending on the project, a range is often more helpful than fictitious accuracy when planning statuses are still in flux. In the Bavarian context, coordination and documentation often run parallel to planning, which is why a clean structure pays off in particular.

Gallery:

Project schedule for noise barriers in Germering

Variants differ primarily in terms of space, appearance and operational maintenance. A stable process combines preliminary inspection, documentation status, interface clarification and the organization of the installation windows. We keep responsibilities and handovers clear so that unresolved issues are not transferred to the construction site. For ecologically oriented projects, we consider systems such as the Klimawand R3 if a green wall logic fits into the comparison of variants. Depending on the location, refurbishment may also make sense. Structured coordination of the interfaces noticeably reduces subsequent expenditure. For local authorities, it is important that requirements are described in a verifiable manner and that decisions can be explained to the administration and committees. For developers, it is important that land use, outdoor spaces and development are not blocked by late changes. Late clarifications result in rescheduling, supplements and additional rounds of coordination, which put a strain on the budget and deadline. A brief preliminary review separates the must-haves from the options and speeds up the comparison of variants. Depending on the project, a range is often more helpful than fictitious accuracy when planning statuses are still in flux. In the Bavarian context, coordination and documentation often run parallel to planning, which is why a clear structure pays off in particular. Robust detail points and clear transitions reduce the need for special solutions later on and make operation easier.

FAQs:

Whether a planning application, planning permission or planning approval is required depends on the depth of the intervention, the sponsor and the objects to be protected, among other things. We clarify this at an early stage with the relevant authorities and prepare the documents in a structured manner. We will clarify this in the site appointment.

Whether the local authority, state/federal government, Autobahn GmbH or DB is responsible depends on the road/railway and section. We identify the right sponsor, coordinate interfaces and define who commissions which services.

Objections can often be mitigated with variants (partial transparency, greening, staggered heights). We prepare variants with effects/costs so that decisions are comprehensible.

Depending on the soil conditions, it makes sense to explore the subsoil. From this we derive the type of foundation and construction sequence recommendations – this reduces cost and deadline risks. We will clarify this in the site appointment.

Easements or agreements are often necessary for private areas. We provide the technical basis (site plan/requirements) and support the municipality in preparing the coordination with owners.

The “wall effect” can be reduced through targeted height staggering, transparent elements or greenery. We check this in the design and coordinate variants with urban design and residents.

We recommend regular visual inspections as well as event-related inspections (storm, accident). We supply checklists and can structure maintenance intervals as a service package.

Funding or co-financing options may be available depending on the sponsor and program. We check starting points (e.g. noise reduction/infrastructure programs) and prepare the necessary documents.

Construction in sections often makes sense. We define short closure windows, logistical access routes and communication modules for residents – so the load remains plannable. We will clarify this in the site appointment.

An acoustic calculation is usually required for dimensioning. Among other things, traffic data (DTV/proportions), speed, topography and affected immission receivers are required. We coordinate the data collection and provide a clear list of requirements.