Sustainable noise protection

100 % ecologically minded

Quick assembly

Stable, flexible, economical

Low-maintenance systems

Without constant irrigation

Innovative solutions

Can also be combined with photovoltaics

The substrate, connections and appearance determine the choice of system in the project. For projects with a connection to Nuremberg, it is worth taking an early look at the boundary conditions, as subsequent corrections will generate costs. You will find current renovation projects on an ongoing basis. Developers look first at areas and construction progress, local authorities at awarding and acceptance; both are brought together in the process. Late clarifications lead to rescheduling, supplements and additional rounds that put pressure on deadlines and budgets. We provide a comprehensible decision-making logic so that requirements, variants and interfaces remain in line. If the focus is on design and environmental impact, we consider variants with a natural stone look and robust surfaces. A preliminary check provides clarity without overburdening the planning status. For local authorities, it is important that requirements are described in a verifiable manner and that decisions can be explained to the administration and committees. For developers, it is important that land use, outdoor spaces and development are not blocked by late changes. Late clarifications lead to rescheduling, supplements and additional rounds of coordination, which put a strain on the budget and deadline. A brief preliminary review separates the must-haves from the options and speeds up the comparison of variants. Depending on the project, a range is often more helpful than fictitious accuracy when plans are still in flux.

Your advantages at a glance.
  • Up to 12 m height
  • Without deep foundation
  • Quick assembly
  • Economic implementation
  • Greenable
  • Flexible lines
  • Suitable for tight spaces
  • Durable and robust

Nuremberg noise barriers for new and existing buildings

A clear process keeps awarding, planning and implementation in line. When comparing variants, space requirements, appearance, robustness, construction phase and inventory quickly lead to different priorities. We structure the choice of system in such a way that the direction taken by the project team remains justifiable and detailed planning does not come to nothing. Contact is a pragmatic option, especially in the construction phase. We combine planning and consulting with a view to statics, material verification and the subsequent logic for maintenance or servicing. If the focus is on design and the effect on the surroundings, we consider variants with a natural stone look and robust surfaces. A resilient system direction is created when application limits and maintenance ideas are also considered. For local authorities, it is important that requirements are described in a verifiable manner and that decisions can be explained to the administration and committees. For developers, it is important that land use, outdoor spaces and development are not blocked by late changes. Late clarifications result in rescheduling, supplements and additional rounds of coordination, which put a strain on the budget and deadline. A brief preliminary review separates the must-haves from the options and speeds up the comparison of variants. Depending on the project, a range is often more helpful than fictitious accuracy when planning statuses are still in flux. In the Bavarian context, coordination and documentation often run parallel to planning, which is why a clean structure pays off in particular.

Gallery:

Implementation of noise barriers in Nuremberg with interfaces

A harmonious interplay of appearance and operation facilitates acceptance. A stable process combines preliminary inspection, documentation status, interface clarification and the organization of the installation windows. We keep responsibilities and handovers clear so that unresolved issues do not end up on the construction site. If the focus is on design and the effect on the surroundings, we consider variants with a natural stone look and robust surfaces. Depending on the location, a noise barrier with photovoltaics may also be a good idea. Structured coordination of the interfaces noticeably reduces the subsequent workload. For local authorities, it is important that requirements are described in a verifiable manner and that decisions can be explained to the administration and committees. For developers, it is important that land use, outdoor spaces and development are not blocked by late changes. Late clarifications result in rescheduling, supplements and additional rounds of coordination, which put a strain on the budget and deadline. A brief preliminary review separates the must-haves from the options and speeds up the comparison of variants. Depending on the project, a range is often more helpful than fictitious accuracy when planning statuses are still in flux. In the Bavarian context, coordination and documentation often run parallel to planning, which is why a clear structure pays off in particular. Robust detail points and clear transitions reduce later special solutions and facilitate operation. A calm, comprehensible process reduces conflicts between the surroundings, use and construction process.

FAQs:

We use available traffic data and add forecast assumptions where necessary. This results in a comparison of variants that justifies the solution that makes sense in terms of noise – also for committees and approvers.

The “wall effect” can be reduced through targeted height staggering, transparent elements or greenery. We check this in the design and coordinate variants with urban design and residents. We clarify this in the site meeting.

Height/length result from sound calculation, geometry (distances/heights), development and protection requirements. We create variants (e.g. 2.5 m / 3.0 m / 3.5 m) with effects, costs and design options. You will receive a short decision document.

We consider robust materials, anti-graffiti coatings and easily accessible cleaning zones. In addition, lighting/visibility and clear maintenance processes help to keep follow-up costs low.

Fewer supplements are achieved through clear stock assumptions, defined options and unambiguous interfaces. We formulate the specifications in such a way that ambiguities are minimized.

Funding or co-financing options may be available depending on the sponsor and program. We check starting points (e.g. noise reduction/infrastructure programs) and prepare the necessary documents.

We provide clear visuals, noise reduction facts and a schedule. This enables the local authority to communicate transparently and avoid typical misunderstandings. We will clarify this in the site appointment.

In the case of bottlenecks, we work with variants (e.g. different foundation, slimmer construction method, offset). The aim is to find a solution that can be approved and that enables construction and subsequent maintenance. We clarify this at the site meeting.

We reduce risks through early stocktaking, clear service descriptions (including options) and defined supplementary processes. This keeps the awarding of contracts manageable for the local authority.

We plan construction phases, work site protection and closure windows in line with commuter times, school routes and events. We also provide a construction phase plan as a basis for coordination with the traffic authority/authorities. You will also receive a brief decision document.