Sustainable noise protection

100 % ecologically minded

Quick assembly

Stable, flexible, economical

Low-maintenance systems

Without constant irrigation

Innovative solutions

Can also be combined with photovoltaics

Unclear interfaces cost time even before implementation begins. In projects around Neumarkt in der Oberpfalz, clear criteria are helpful so that awarding and project development do not run counter to each other. You will find the latest news on an ongoing basis. Developers look first at areas and construction progress, local authorities at awarding and acceptance; both are brought together in the process. Late clarifications lead to rescheduling, supplements and additional rounds that put pressure on deadlines and budgets. We provide a comprehensible decision-making logic so that requirements, variants and interfaces remain in line. We combine planning and consulting with a view to statics, material verification and the subsequent logic for maintenance or servicing. A clean alignment of the boundary conditions reduces friction in the project team. For local authorities, it is important that requirements are described in a verifiable manner and that decisions can be explained to the administration and committees. For developers, it is important that land use, outdoor spaces and development are not blocked by late changes. Late clarifications lead to rescheduling, supplements and additional rounds of coordination, which put a strain on the budget and deadline. A brief preliminary review separates the must-haves from the options and speeds up the comparison of variants. Depending on the project, a range is often more helpful than fictitious accuracy when plans are still in flux.

Your advantages at a glance.
  • Up to 12 m height
  • Without deep foundation
  • Quick assembly
  • Economic implementation
  • Greenable
  • Flexible lines
  • Suitable for tight spaces
  • Durable and robust

Noise barriers Neumarkt in der Oberpfalz Variants, appearance and space requirements

The substrate, connections and appearance determine the choice of system in the project. When comparing variants, space requirements, appearance, robustness, construction phase and existing buildings quickly lead to different priorities. We structure the choice of system in such a way that the direction taken by the project team remains justifiable and detailed planning does not come to nothing. Contact is a pragmatic option, especially in the construction phase. If dual use seems sensible, we examine the combination of noise protection and photovoltaics as an option, depending on the project requirements. If dual use seems sensible, we examine the combination of noise protection and photovoltaics as an option, depending on the project requirements. A comparison of variants works if the mandatory points are clarified first and the details follow afterwards. For local authorities, it is important that requirements are described in a verifiable manner and that decisions can be explained to the administration and committees. For developers, it is important that land use, outdoor spaces and development are not blocked by late changes. Late clarifications lead to rescheduling, supplements and additional rounds of coordination, which put a strain on the budget and deadline. A brief preliminary review separates the must-haves from the options and speeds up the comparison of variants. Depending on the project, a range is often more helpful than fictitious accuracy when planning statuses are still in flux. In the Bavarian context, coordination and documentation often run parallel to planning, which is why a clean structure pays off in particular.

Gallery:

Project schedule for noise barriers in Neumarkt in der Oberpfalz

Deadline risks increase if boundary conditions are only clarified after the design. A stable process combines preliminary review, document status, interface clarification and the organization of the assembly windows. We keep responsibilities and handovers clear so that open points do not end up on the construction site. If dual use seems sensible, we examine the combination of noise protection and photovoltaics as an option, depending on the project requirements. Depending on the location, a company may also make sense. A calm process with clear handovers makes deadlines more resilient and reduces friction. For local authorities, it is important that requirements are described in a verifiable manner and that decisions can be explained to the administration and committees. For developers, it is important that land use, outdoor spaces and development are not blocked by late changes. Late clarifications result in rescheduling, supplements and additional rounds of coordination, which put a strain on the budget and deadline. A brief preliminary review separates the must-haves from the options and speeds up the comparison of variants. Depending on the project, a range is often more helpful than fictitious accuracy when planning statuses are still in flux. In the Bavarian context, coordination and documentation often run parallel to planning, which is why a clear structure pays off in particular. Robust detail points and clear transitions reduce the need for special solutions later on and make operation easier.

FAQs:

Whether the local authority, state/federal government, Autobahn GmbH or DB is responsible depends on the road/railway and section. We identify the right sponsor, coordinate interfaces and define who commissions which services.

An acoustic calculation is usually required for dimensioning. Among other things, traffic data (DTV/proportions), speed, topography and affected immission receivers are required. We coordinate the data collection and provide a clear list of requirements.

Depending on the soil conditions, it makes sense to explore the subsoil. From this we derive the type of foundation and construction sequence recommendations – this reduces cost and deadline risks.

Construction in sections often makes sense. We define short closure windows, logistical access routes and communication modules for residents – so the load remains plannable.

Cost drivers are often subsoil/foundation, height/length, line adjustments and traffic safety. We create a cost estimate with bandwidths and show levers (material, geometry, construction phases). We will clarify this in the site appointment.

We provide clear visuals, noise reduction facts and a schedule. This enables the local authority to communicate transparently and avoid typical misunderstandings. We will clarify this in the site appointment.

Depending on the location and sponsor, a building permit may be sufficient or a planning procedure may be necessary (e.g. in the context of roads or railroads). We examine the specific case, name the required documents and draw up a realistic schedule.

We draw up a clear specification of services including quantity estimates, quality requirements (material, coating, sound insulation values) and interfaces (pipes, traffic safety). On request, we can assist with bidder questions and evaluation.

We check parcels of land/property, necessary verges, access for construction and maintenance as well as any easements. This results in an area plan including a list of measures (purchase, usage agreement, route adjustment). You will receive a short decision document.

The “wall effect” can be reduced through targeted height staggering, transparent elements or greenery. We check this in the design and coordinate variants with urban design and residents. You will receive a short decision document.