Sustainable noise protection

100 % ecologically minded

Quick assembly

Stable, flexible, economical

Low-maintenance systems

Without constant irrigation

Innovative solutions

Can also be combined with photovoltaics

In densely built-up areas, coordination quickly becomes a time factor. In the urban area of Ottobrunn, noise protection often becomes a balancing point between usability, acceptance and construction progress. You will find current companies on an ongoing basis. Developers look first at space and construction progress, local authorities at allocation and acceptance; both are brought together in the process. Late clarifications lead to rescheduling, supplements and additional rounds that put pressure on deadlines and budgets. We provide a comprehensible decision-making logic so that requirements, variants and interfaces remain in line. If the focus is on design and environmental impact, we consider variants with a natural stone look and robust surfaces. A clear list of criteria stabilizes the next steps without complicating things unnecessarily. For local authorities, it is important that requirements are described in a verifiable manner and that decisions can be explained to the administration and committees. For developers, it is important that land use, outdoor spaces and development are not blocked by late changes. Late clarifications lead to rescheduling, supplements and additional rounds of coordination, which put a strain on the budget and deadline. A brief preliminary review separates the must-haves from the options and speeds up the comparison of variants. Depending on the project, a range is often more helpful than fictitious accuracy when plans are still in flux.

Your advantages at a glance.
  • Up to 12 m height
  • Without deep foundation
  • Quick assembly
  • Economic implementation
  • Greenable
  • Flexible lines
  • Suitable for tight spaces
  • Durable and robust

System selection for noise barriers in Ottobrunn

For local authorities, what counts is testability, for developers, usability. When comparing variants, space requirements, appearance, robustness, construction phase and existing buildings quickly lead to different priorities. We structure the choice of system in such a way that the direction taken by the project team remains justifiable and detailed planning does not come to nothing. Contact is a pragmatic option, especially in the construction phase. In ecologically oriented projects, we consider systems such as Klimawand R3 if a green wall logic fits into the comparison of variants. We combine planning and consulting with a view to statics, material verification and the subsequent logic for maintenance or servicing. A comparison of variants works when mandatory points are clarified first and details follow afterwards. For local authorities, it is important that requirements are described in a verifiable manner and that decisions can be explained to the administration and committees. For developers, it is important that land use, outdoor spaces and development are not blocked by late changes. Late clarifications lead to rescheduling, supplements and additional rounds of coordination, which put a strain on the budget and deadline. A brief preliminary review separates the must-haves from the options and speeds up the comparison of variants. Depending on the project, a range is often more helpful than fictitious accuracy when planning statuses are still in flux. In the Bavarian context, coordination and documentation often run parallel to planning, which is why a clean structure pays off in particular.

Gallery:

Project schedule for noise barriers in Ottobrunn

The system direction becomes viable if application limits are defined at an early stage. A stable process combines preliminary inspection, documentation status, interface clarification and the organization of the installation windows. We keep responsibilities and handovers clear so that unresolved issues are not transferred to the construction site. If construction phases run parallel to operations, temporary noise protection using mobile noise barriers can simplify coordination. Depending on the location, mobile noise barriers can also be useful. Structured coordination of the interfaces noticeably reduces the subsequent workload. For local authorities, it is important that requirements are described in a verifiable manner and that decisions in administration and committees remain explainable. For developers, it is important that land use, outdoor spaces and development are not blocked by late changes. Late clarifications result in rescheduling, supplements and additional rounds of coordination, which put a strain on the budget and deadline. A brief preliminary review separates the must-haves from the options and speeds up the comparison of variants. Depending on the project, a range is often more helpful than fictitious accuracy when planning statuses are still in flux. In the Bavarian context, coordination and documentation often run parallel to planning, which is why a clear structure pays off in particular. Robust detail points and clear transitions reduce later special solutions and facilitate operation. A calm, comprehensible process reduces conflicts between the surroundings, use and construction process.

FAQs:

Whether the local authority, state/federal government, Autobahn GmbH or DB is responsible depends on the road/railway and section. We identify the right sponsor, coordinate interfaces and define who commissions which services.

We recommend regular visual inspections as well as event-related inspections (storm, accident). We supply checklists and can structure maintenance intervals as a service package. You will receive a short decision document.

Early information with visualizations, an on-site appointment and a short feedback phase have proven their worth. This allows sensitive points (appearance, transparency, height) to be taken into account at an early stage. We will clarify this in the site appointment.

Depending on the situation, temporary closures, detour or night/weekend work may be required. We coordinate variants and optimize procedures and safety. You will receive a short decision document.

The decisive factors are distance to the source, height, line of sight between the source and the place of immission and reflections. We optimize the geometry so that the effect is high and the construction costs remain within reasonable limits.

We use available traffic data and add forecast assumptions where necessary. This results in a comparison of variants that justifies the solution that makes sense in terms of noise – also for committees and approvers. You will receive a short decision document.

Cost drivers are often subsoil/foundation, height/length, line adjustments and traffic safety. We create a cost estimate with bandwidths and show levers (material, geometry, construction phases).

Depending on the location and sponsor, a building permit may be sufficient or a planning procedure may be necessary (e.g. in the context of roads or railroads). We examine the specific case, name the required documents and draw up a realistic schedule.

Interventions in vegetation, potential breeding and roosting areas and protected areas are typical. We clarify at an early stage which inspections are necessary and plan construction periods in such a way as to ensure that closure periods are adhered to.

We reduce risks through early stocktaking, clear service descriptions (including options) and defined supplementary processes. This keeps the awarding of contracts manageable for the local authority. You will receive a short decision document.