Quick to set up: RAU Rock Mobile

It is not always noise from outside that is disturbing. This noise barrier in Oberkirch was erected on the premises of a paper factory. There are currently skips in the inner courtyard, the handling of which causes noise from outside.

As the noise protection had to be installed as quickly as possible, the Mobile RAU Rock was supplied on steel feet. The concrete elements, normally the base of the mobile noise barrier, e.g. at construction sites, were used as weights on the steel structure in this case.

The paper company naturally has equipment for transporting heavy weights and experienced specialists to operate it. We received energetic and extremely professional help from them during assembly, for which we would like to take this opportunity to thank you. It was great working with you!

Details

Length: 15.00 m
Height: 6.00 m
Construction period: 27.11. to 30.11.2023

Client

Koehler Oberkirch GmbH
Hauptstraße 2
77704 Oberkirch