Sustainable noise protection

100 % ecologically minded

Quick assembly

Stable, flexible, economical

Low-maintenance systems

Without constant irrigation

Innovative solutions

Can also be combined with photovoltaics

What counts for local authorities is testability, for developers it is usability. In the urban area of Aschaffenburg, noise protection often becomes a point of consideration between usability, acceptance and construction progress. You will find current references on an ongoing basis. Property developers look first at space and the construction process, local authorities at the awarding of contracts and acceptance; both are brought together in the process. Late clarifications lead to rescheduling, supplements and additional rounds that put pressure on deadlines and budgets. We provide a comprehensible decision-making logic so that requirements, variants and interfaces remain in line. In the case of existing systems, refurbishment can be cost-effective if the beams, distances and depth of intervention allow further use. A preliminary check provides clarity without overburdening the planning status. For local authorities, it is important that requirements are described in a verifiable manner and that decisions can be explained to the administration and committees. For developers, it is important that land use, outdoor spaces and development are not blocked by late changes. Late clarifications lead to rescheduling, supplements and additional rounds of coordination, which put a strain on the budget and deadline. A brief preliminary review separates the must-haves from the options and speeds up the comparison of variants. Depending on the project, a range is often more helpful than fictitious accuracy when planning statuses are still in flux. In the Bavarian context, coordination and documentation often run parallel to planning, which is why a clean structure pays off in particular.

Your advantages at a glance.
  • Up to 12 m height
  • Without deep foundation
  • Quick assembly
  • Economic implementation
  • Greenable
  • Flexible lines
  • Suitable for tight spaces
  • Durable and robust

Noise barriers Aschaffenburg Variants, appearance and space requirements

A clear set of criteria makes decisions comprehensible and sustainable. When comparing variants, space requirements, appearance, robustness, construction phase and existing buildings quickly lead to different priorities. We structure the choice of system in such a way that the direction taken by the project team remains justifiable and detailed planning does not come to nothing. Climate change R3 is a pragmatic option, especially in the construction phase. Refurbishment can be economical for existing systems if the beams, distances and depth of intervention allow further use. If construction phases run parallel to operation, temporary noise protection using mobile noise barriers can simplify coordination. Depending on the project, the most robust solution is often the one that generates the least amount of extra work during operation. For local authorities, it is important that requirements are described in a verifiable manner and that decisions can be explained to the administration and committees. For developers, it is important that land use, outdoor spaces and development are not blocked by late changes. Late clarifications lead to rescheduling, supplements and additional rounds of coordination, which put a strain on the budget and deadline. A brief preliminary review separates the must-haves from the options and speeds up the comparison of variants. Depending on the project, a range is often more helpful than fictitious accuracy when planning statuses are still in flux. In the Bavarian context, coordination and documentation often run parallel to planning, which is why a clean structure pays off in particular.

Gallery:

Implementation of noise barriers in Aschaffenburg with interfaces

The right solution is based on space requirements, environmental impact and the construction process. A stable process combines preliminary inspection, documentation status, interface clarification and the organization of the assembly windows. We keep responsibilities and handovers clear so that open points do not end up on the construction site. If the focus is on design and the effect on the surroundings, we consider variants with a natural stone look and robust surfaces. Depending on the location, mobile noise barriers may also be a sensible option. If responsibilities are clarified at an early stage, implementation remains on track. For local authorities, it is important that requirements are described in a verifiable manner and that decisions can be explained to the administration and committees. For developers, it is important that land use, outdoor spaces and development are not blocked by late changes. Late clarifications lead to rescheduling, supplements and additional rounds of coordination, which put a strain on the budget and deadline. A brief preliminary review separates the must-haves from the options and speeds up the comparison of variants. Depending on the project, a range is often more helpful than fictitious accuracy when planning statuses are still in flux. In the Bavarian context, coordination and documentation often run parallel to planning, which is why a clean structure pays off in particular. Robust detail points and clear transitions reduce later special solutions and facilitate operation. A calm, comprehensible process reduces conflicts between the surroundings, use and construction process.

FAQs:

Whether a planning application, planning permission or planning approval is required depends on the depth of the intervention, the sponsor and the objects to be protected, among other things. We clarify this at an early stage with the relevant authorities and prepare the documents in a structured manner.

Whether the local authority, state/federal government, Autobahn GmbH or DB is responsible depends on the road/railway and section. We identify the right sponsor, coordinate interfaces and define who commissions which services.

The decisive factors are distance to the source, height, line of sight between the source and the place of immission and reflections. We optimize the geometry so that the effect is high and the construction costs remain within reasonable limits.

In the case of bottlenecks, we work with variants (e.g. different foundation, slimmer construction method, offset). The aim is to find a solution that can be approved and that enables construction and subsequent maintenance. We will clarify this in the site appointment.

Depending on the situation, temporary closures, detour or night/weekend work may be required. We coordinate variants and optimize procedures and safety.

Fewer supplements are achieved through clear stock assumptions, defined options and unambiguous interfaces. We formulate the specifications in such a way that ambiguities are minimized. You will receive a short decision document.

Cost drivers are often subsoil/foundation, height/length, line adjustments and traffic safety. We create a cost estimate with bandwidths and show levers (material, geometry, construction phases).

The effect is documented by means of an acoustic calculation (actual/forecast case, comparison of variants). We derive the height, length and position from this and document the expected reduction in noise levels in a comprehensible manner.

We reduce risks through early stocktaking, clear service descriptions (including options) and defined supplementary processes. This keeps the awarding of contracts manageable for the local authority.

It is low-maintenance thanks to suitable surfaces, modular elements and defined cleaning intervals. We calculate maintenance costs transparently and suggest suitable protection systems. We will clarify this in the site appointment.